Brochures / CAD
Contact Us
日本語
English
中文
About Us
About Us
Basic Information
Corporate Profile
President's Message
Vision & Philosophy
Offices and related facilities
Group Companies
History
Link
NEWS
Mission「Construction Revolution」
Construction Revolution
Five Construction Principles
Functional Structure™
Implant™ Method
Future Applications
Research & Development
Business Introduction
Understanding GIKEN LTD.
Strengths of the GIKEN Group
Remote Company Tour
Lunar Construction Project
Project to Renovate the Quay Walls of World Heritage-listed Canals in Netherlands
Information Transmission Base for Press-in Technologies RED HILL 1967
Press-in Method
Press-in Method
Basic Information
What are piles in the first place?
Press-in Principle
Press-in Procedure
Overcoming Hard Ground Conditions
Penetration Techniques
Press-in with Water Jetting
Press-in with Integral Augering
Rotary Cutting Press-in
Practical Technology
GRB System™
ICT Construction Technology
Environmentally Friendly Design
Products
Products
Press-in Machine
Hydraulic Pile Press-in and Extraction Machinery
GRB System™ Equipment
Special Auxiliary Equipment
Automation and laboursaving technology
Automated Parking Facilities
ECO Park™
EV ECO Park™
ECO Cycle™
MOBILE ECO Cycle™
Application
Support
GTOSS™(GIKEN Total Support System)
Download documents
Brochures
CAD
Solutions
Solutions
Method of construction
Hard Ground Press-in Method
Gyropress Method™
Combi-Gyro Method™
Skip Lock Method™
Non-staging Method
Overhead Clearance Method
Zero Clearance Method
Tubular Sheet Pile Press-in Method
Concrete Sheet Pile Press-in Method
Implant™ Structure
Overview of the Implant™ Structure
Implant™ Levee
Implant™ Lock Levee
Implant™ Bell Cap Bridge
Solution
Application examples
Main Overseas Projects
IR
IR
IR library
Mid-Term Management Plan
Financial Results
Meeting of Shareholders
Sustainability
Sustainability
E(Environment)
Commitment to Carbon Neutrality
Approach to TCFD Recommendations
S(Social)
Work-Life Balance
G(Governance)
Corporate governance
Disaster prevention
HOME
Application examples
Disaster prevention
Select ALL
From Structure
Select ALL
Levee
River dike
Foundation
Other
Disaster restoration (Channel installation)
Tank foundation (Liquefaction measure)
Levee reinforcement (Liquefaction measure)
Foundation piles of seawalls
River revetment protection wall renovation
Prevention of ground subsidence①