Method of construction Hard Ground Press-in MethodThe Hard Ground Press-in Method makes it possible to install piles through a hard soil layer with an SPT value greater than 50, which has been difficult with conventional methods. Gyropress Method™The Gyropress Method™ provides a tubular pile installation while keeping the existing structure in place because it uses the rotary cutting function. Combi-Gyro Method™The "Combi-Gyro Method" is a piling method that enables just a single press-in machine to construct a wall combined with tubular piles called "Combi-Gyro Wall". Skip Lock Method™The ”Skip Lock Method™” has been developed to realise construction of continuous piles with a large spacing between piles, which has been difficult to achieve with the GYRO PILER™ alone. Non-staging MethodThe "Non-Staging Method" does away with temporary works during construction and overcomes various space restrictions. Overhead Clearance MethodThe ”Overhead Clearance Method” is a dedicated press-in method for sites where overhead clearance is limited, such as under bridges and high-voltage power lines. Zero Clearance MethodThe "Zero Clearance Method" is a press-in method for pile installation with zero clearance to adjacent structures. Tubular Sheet Pile Press-in MethodThe "Tubular Sheet Pile Press-in Method" is a piling method for constructing a robust and rational continuous-pile wall by using immensely strong and durable tubular sheet piles. Concrete Sheet Pile Press-in MethodThe "Concrete Sheet Pile Press-in Method" uses a special press-in machine in order to quickly install concrete sheet piles with high precision. Implant Structure Overview of the Implant™ StructureEmbedded resilient piled foundations installed into the ground by the Press-in Method Implant™ LeveeIt is a robustly strong levee made using an “implant structure” that is being constructed in various places since the Great East Japan Earthquake. Implant™ Lock LeveeImplant Lock Levee utilises Implant Structure, which involves installing two rows of steel sheet piles and building a "bulkhead" inside the earthen embankment, making the levee stronger. Implant™ Bell Cap BridgeA bridge that can be rapidly constructed using a tubular pile in the bridge supports and a large covering panel on the superstructure.