River
Bottom fixation of a river revetment protection wall
Fukuoka city, Fukuoka, Japan


Features
・Press-in method with water jetting applied to a ground with N-values between 25 and 50
・Adopted no noise/vibration construction adjacent to office buildings in the city center
・Reduction in material and construction costs by adopting 900 Hat-shaped steel sheet piles in the river revetment protection wall
・Reduction in construction period by using multiple SILENT PILERTM
Construction machine used | SILENT PILER™ (ECO900) |
---|---|
Type/Dimension | 1,714 Hat-shaped steel sheet piles 10H, L = 12.0 - 13.5 m |

Construction plan

Construction section

Soil boring log