GIKEN LTD.の画像
  • Brochures / CAD
  • Contact Us
  • 日本語
  • English
  • 中文
  • About Us
    About Us
    • Basic Information
      • Corporate Profile
      • President's Message
      • Vision & Philosophy
      • Offices and related facilities
      • Group Companies
      • History
      • Link
      • NEWS
    • Mission「Construction Revolution」
      • Construction Revolution
      • Five Construction Principles
      • Functional Structure™
      • Implant™ Method
      • Future Applications
      • Research & Development
    • Business Introduction
      • Understanding GIKEN LTD.
      • Strengths of the GIKEN Group
      • Remote Company Tour
      •  
      • Lunar Construction Project
      • Project to Renovate the Quay Walls of World Heritage-listed Canals in Netherlands
      • Information Transmission Base for Press-in Technologies RED HILL 1967
  • Press-in Method
    Press-in Method
    • Basic Information
      • What are piles in the first place?
      • Press-in Principle
      • Press-in Procedure
    • Overcoming Hard Ground Conditions
      • Penetration Techniques
      • Press-in with Water Jetting
      • Press-in with Integral Augering
      • Rotary Cutting Press-in
    • Practical Technology
      • GRB System™
      • ICT Construction Technology
      • Environmentally Friendly Design
  • Products
    Products
    • Press-in Machine
      • Hydraulic Pile Press-in and Extraction Machinery
      • GRB System™ Equipment
      • Special Auxiliary Equipment
      • Automation and laboursaving technology
    • Automated Parking Facilities
      • ECO Park™
      • EV ECO Park™
      • ECO Cycle™
      • MOBILE ECO Cycle™
      • Achievements
    • Support
      • GTOSS™(GIKEN Total Support System)
      • GTOSS MEMBERS
    • Download documents
      • Brochures
      • CAD
  • Solutions
    Solutions
    • Method of construction
      • Hard Ground Press-in Method
      • Gyropress Method™
      • Combi-Gyro Method™
      • Skip Lock Method™
      • Non-staging Method
      • Overhead Clearance Method
      • Zero Clearance Method
      • Tubular Sheet Pile Press-in Method
      • Concrete Sheet Pile Press-in Method
    • Implant™ Structure
      • Overview of the Implant™ Structure
      •  
      • Implant™ Levee
      • Implant™ Lock Levee
      • Implant™ Bell Cap Bridge
    • Solution
      • Application examples
      • Main Overseas Projects
  • IR
    IR
    • IR library
      • Mid-Term Management Plan
      • Financial Results
      • Meeting of Shareholders
  • Sustainability
    Sustainability
    • E(Environment)
      • Commitment to Carbon Neutrality
      • Approach to TCFD Recommendations
    • S(Social)
      • Work-Life Balance
    • G(Governance)
      • Corporate governance

Railway

  1. HOME
  2. Application examples
  3. Railway

From Structure

  • Select ALL
  • Bridge
  • Other

Prevention of ground subsidence①

  • Fields
  • Railway
  • Disaster prevention
  • Structure
  • Other
  • View ALL

Construction of a (subway) station box in a canal

  • Fields
  • Railway
  • River
  • Structure
  • Bridge
  • Other
  • View ALL
Application examples
  • Other
  • Road
  • Railway
  • River
  • Harbor
  • Coast
  • Construction
  • Disaster prevention
  • Recovery
News
  • 2025/5/15NEWS RELEASEMLIT and MEXT Decide to Continue Technology R&D Contract for the Space Construction Innovation Project
  • 2025/5/7IR NEWSNotice Concerning the Status of Acquisition of Own Shares
  • 2025/4/21NEWS RELEASEGyropress Method™ Employed for Disaster Recovery Work at Site of Large-scale Landslide at Ichinose-machi in Wajima-shi
  • 2025/4/10IR NEWSNotice Concerning Determination of Matters Related to Acquisition of Own Shares has been posted.
  • 2025/4/10IR NEWSNotice on the Revision of Dividends Forecast (Commemorative Dividend on the 50th Year Anniversary of SILENT PILERTM) has been posted.

About Us

  • Corporate Profile
  • President's Message
  • Vision & Philosophy
  • Offices and related facilities
  • Group Companies
  • History
  • Link
  • Construction Revolution
  • Five Construction Principles
  • Functional Structure™
  • Implant™ Method
  • Future Applications
  • Research & Development
  • Understanding GIKEN LTD.
  • Strengths of the GIKEN Group
  • Remote Company Tour
  • Project

Press-in Method

  • What are piles in the first place?
  • Press-in Principle
  • Press-in Procedure
  • GRB System™
  • ICT Construction Technology
  • Environmentally Friendly Design

Products

  • Hydraulic Pile Press-in and Extraction Machinery
  • GRB System™ Equipment
  • Special Auxiliary Equipment
  • Automation and laboursaving technology
  • ECO Park™
  • EV ECO Park™
  • ECO Cycle™
  • MOBILE ECO Cycle™
  • Achievements
  • GTOSS™(GIKEN Total Support System)
  • Brochures / CAD

Solutions

  • Hard Ground Press-in Method
  • Gyropress Method™
  • Combi-Gyro Method™
  • Skip Lock Method™
  • Non-staging Method
  • Overhead Clearance Method
  • Zero Clearance Method
  • Tubular Sheet Pile Press-in Method
  • Concrete Sheet Pile Press-in Method
  • Overview of the Implant™ Structure
  • Implant™ Levee
  • Types of Usage
  • Implant™ Lock Levee
  • Implant™ Bell Cap Bridge
  • Main Overseas Projects

IR

  • Mid-Term Management Plan
  • Financial Results
  • Meeting of Shareholders

Sustainability

  • Commitment to Carbon Neutrality
  • Approach to TCFD Recommendations
  • Work-Life Balance
  • Corporate governance

SNS

  • GIKEN LTD. LinkedIn
  • GIKEN LTD. Youtube
  • Privacy Policy
  • Social Media Guideline
  • Terms of Use
  • Cookie Settings

© 1999 GIKEN LTD. All Rights Reserved.

Responsive WordPress Theme Freetheme wordpress magazine responsive freetheme wordpress news responsive freeWORDPRESS PLUGIN PREMIUM FREE Download theme freeDownload html5 theme free - HTML templates Free Null24