Taking an important principal of the GRB Non-staging System to realize temporary work-free construction, a series of specialist machines, which utilize reaction force as their basic mode of operation, has been designed and developed. With the GRB equipment and devices, all moving, pitching, and pressing-in of piles is systematically carried out from the top of fully installed piles. Thereby the GRB System completely abolishes problems associated with the necessity for temporary facilities and works once and for all. The most practical GRB non-staging equipment out of a full range of the systemized machinery is shown below, and is available through Giken's World Network.

 

 

In the standard system layout the Silent Piler is followed by a small pile pitching "Clamp Crane" which, like the Silent Piler itself, walks along and clamps onto fully installed piles. Piles to be pitched into the Silent PIler are carried by an engine powered pile transporter "Pile Runner" which is mounted upon a trackway formed from inverted piles attached to the top of the completely installed piles.

 

Click underlined names for detailed information.

2.9t

7t

10t

20t

25t

50t

160t

 

5t

U Profile

CB1A
CB1-6
CB1-7

CB2-3
CB2-4
CB2-5

CB2-6
CB2-8

       

TB3
PR1

Tubular

CB1-7

CB2-3

CB2-6

CB3-1
CB3-2

 

CB4-1

CB5-1

TB4

Zero

CB1-7

           

TB3
PR1

H Profile

       

CB3-3

   

Concrete (Flat)

CB1-6