For A True Revolution in Constuction Methods |
Eliminating temporary works and their associated costs is becoming
one of the main concerns of shortening construction duration and significantly
reducing overall costs of projects. Particularly in the case of construction
works over water, it is usual to construct vast temporary facilities at much
expense and effort far and above that necessary for the required construction
work. Giken herewith proposes the Non-staging Method to abolish this precise
problem once and for all.
The Non-staging Method continuously presses-in sheet piles to construct a
pile wall and then itself utilizes the top of this pile wall as the platform
for all the required equipment, thereby eliminating the necessity for temporary
works and the associated enormous costs. Two additional problems are solved
by the use of this method, both disturbance to water traffic or water flow
and side effects such as flooding are also eliminated due to the absence of
temporary facilities. Other methods will always contain elements of these
problems.
The Non-staging Method is therefore known as a true "Construction
Solution Method".