For A True Revolution in Constuction Methods

 

Eliminating temporary works and their associated costs is becoming one of the main concerns of shortening construction duration and significantly reducing overall costs of projects. Particularly in the case of construction works over water, it is usual to construct vast temporary facilities at much expense and effort far and above that necessary for the required construction work. Giken herewith proposes the Non-staging Method to abolish this precise problem once and for all.
The Non-staging Method continuously presses-in sheet piles to construct a pile wall and then itself utilizes the top of this pile wall as the platform for all the required equipment, thereby eliminating the necessity for temporary works and the associated enormous costs. Two additional problems are solved by the use of this method, both disturbance to water traffic or water flow and side effects such as flooding are also eliminated due to the absence of temporary facilities. Other methods will always contain elements of these problems.
The Non-staging Method is therefore known as a true "Construction Solution Method".