Giken Rail Safe Method enables you to allow not only the continuation train services but also full time regular operation in complete safety during sheet piling works alongside railways, because there is no danger of accidents caused by objects falling down or machines overturning.

 

 

Within the range of construction accidents, the incidence of falling material or equipment is increasing, with the major cause being due to the main construction system itself. This means that there is always the potential of an accident occurring under any conditions due to the inherent nature of the construction system itself. Due to these feared accidents, piling works close to railways are permitted only at night after the last train and before the first train the next day. Therefore actual working hours are very limited and naturally the work takes longer and the cost of the project increases.

 

To solve this problem the principle of the equipment and the construction method should be changed to eliminate even the possibility of an accident occurring. All our equipment grasps already installed piles and utilizes their reaction force for ultimate stability. Utilizing this stable system adjacent to railways, roads and structures, we safely carry out the construction work and can operate 24 hours a day without the need for time restrictions. There is total peace of mind for all those concerned with both the construction and adjacent facilities.