Brochures

- Gyropress Method
- Self-walking Rotary Press-in Method for Tubular Piles with Tip Bit.
2.21MB - Ver.3.2EN02

- Hard Ground Press-in Method
- Press-in Method for constructing structural wall at hard ground condition, such as sandy gravel layers with boulders and rock.
6.46MB - Ver.5.0EN01

- GRB Non-staging Method / GRB Narrow Access Method
- Press-in Method for constructing structural wall directly without any temporary works and facilities at confined or restricted sites.
839KB - Ver.1.0EN01

- GRB Overhead Clearance Method
- Press-in Method for constructing structural wall beneath overhead obstruction without giving any impact on current surrounding functions.
305KB - Ver.1.0EN01

- Zero Clearance Method
- Press-in Method for constructing structural wall with zero clearance to adjacent structures and boundaries.
515KB - Ver.1.0EN01

- Concrete Sheet Pile Press-in Method
- Press-in Method for constructing concrete structural wall by jacking in prefabricated Concrete Sheet Piles.
266KB - Ver.1.0EN01

- Tubular Sheet Pile Press-in Method
- Press-in Method for constructing very strong and long lasting structural wall by jacking in Tubular Sheet Piles.
3.28MB - Ver.3.1EN02

- ECO Underpass Method
- Press-in Method for constructing underpass structural wall with less work processes and minimum disturbance to the existing live traffic.
2.02MB - Ver.1.1EN02

- Implant Bridge
- Press-in Method for constructing bridge structure with less work processes and least negative impact to surrounding environment.
1.02MB - Ver.1.0EN02
















